The Phú Mỹ Bridge (Vietnamese: Cầu Phú Mỹ) is a cable-stayed road bridge over the Saigon River in Ho Chi Minh City, Vietnam.The bridge was constructed from March 2007 to September 2009 by a consortium consisting of Baulderstone, Bilfinger Berger, Freyssinet International (cable stays and stressing), and the Vietnamese company CC620 (concrete, formwork, etc.) and was designed by the French consultant Arcadis (design of the main bridge) and Cardno (design of the approaches).